Value Proposition

Significant value can be obtained from implementing and managing a risk based inspection (RBI) program in your refining, petrochemical or chemical facility. We will show you real examples from owner operators along with empirical results comparing current maintenance costs and risks with the reduced maintenance costs and risk reduction following the implementation of RBI.
Webinar: developing the value proposition and business case for an rbi program

Bring your pen - you're going to need it - and be prepared to share the following:

  • Lost Profit/Day During Shutdown
  • Analysis Interval (years)
  • Turnaround interval or duration set by inspectors / testing?
  • Number of Pressure Vessels
  • Number of Columns
  • Number of API Tanks
  • Number of Piping Circuits
  • Number of PSVs
  • Average Vessel Internal Inspection Interval
  • Average Vessel External INspection Interval
  • Average API Tank Internal Inspection Interval
  • Average API Tank External Inspection Interval
  • Average PSV Inspection Interval

We will show you how to calculate the following: RBI Value To Plant

Webinar Inquiry

Related Services

Risk Based Inspection (RBI) Implementation and Planning

AOC has delivered thousands of sustainable Risk Based Inspection (RBI) programs earning the trust of owner operators.

Master Data Management and Data Conversion

Innovative technology that allows quick, efficient extraction of data into a knowledge-centric world

Mechanical Integrity Assessments

An interdependent assessment of your people, process, and technologies for a confident path forward

Damage Mechanism Review / Corrosion Study

One of the most important steps in an RBI project is the corrosion study or damage mechanism review.

End-of-Life, Remaining-Life, and Fitness-for-Service Assessments

When evaluation of inspection results suggest that an asset is near its end of useful life, Fitness for Service evaluations can determine if the asset us suitable for continued operation.

Corrosion Control Planning

Achieving zero corrosion-related loss of primary containment in the refining industry.

Reliability Based Asset Management - AIM for all asset families

Asset Integrity Management for all asset families - Rotating, Electrical, Instrumentation, and Fixed Assets

Related Training

RBI/MI Overview

What is Risk Based Inspection?

API 580 RBI Overview

What impact does Risk Based Inspection (RBI) have on my organization?

API 580 Training

Is your Risk Based Inspection (RBI) program aligned with the API 580 Recommended Practice? Are you ready for certification?

API 581 Overview

What's actually going on inside all of that fancy software? An introduction to the API 581 methodology.

Risk Based Inspection (RBI) - A Mechanical Integrity Best Practice

What are your goals for RBI? How will you measure your success? How will you sustain that success?

RBI Concepts - Return on Net Assets (RONA)

Asset Integrity Management – how you perform at the plant level affects those goals set at the board room

Reliability Revolution - Measuring the Value of an RBI Program

How does one of the largest chemical manufacturers measure the value of their RBI program?

Calculating the Value Contribution

How does your AI program meet your RONA goals?

Related Knowledge

Risk Based Inspection Yields Big Savings for Gulf Coast Plant

A 26-Year-Old Gulf Coast Chemical Plant Saves over $15 Million in Related Inspection Activities.

RBMI Implementation Saves Refinery $63 Million

130,000 BPD Refinery Implements RBMI Program and projects a $63 Million savings over 10 years.

Corrosion Under Insulation (CUI) in Plant Equipment and Piping

Implementation of a managed CUI program yields prioritized inspection plans and identifies imminent failures.

Safe Operation of Aging Hydrogen Generation Plants

Integrating DMR, RBI, and IOWs to manage aging plant reliability

The MI Assessment - Understanding Your Mechanical Integrity Goals

Compliance? | Best Practice? | Risk Reduction? | One Step at a Time? | Capture Personnel Knowledge? | All Of The Above?

Operational Readiness: Construction, Startup, Operations and Maint.

Design basis RBI? Why not optimize all your asset families prior to RFSU?

Data Mining, Management, and Migration

Sometimes moving millions of data fields from ten different databases to another seems like trying to get a thousand birds to leave the branches of one tree and land on just the right branches of another.

Production Loss Accounting - Heat Exchanger Bad Actor Analysis

Heat exchanger failures contribute to over $146M in losses for a large refining enterprise.

Risk Based Inspection: What To Expect

Significant findings, even after ten years.

Storage Tank RBI

How many RBI studies have been completed on above ground storage tanks (ASTs)? We have completed hundreds.

Time to Value - Asset Integrity Management

Delivering knowledge based asset files from the true sources of data - confidently, accurately, electronically, and in half the time.

Implementing RBI in Remote Locations

The importance of understanding risk and the significant value attainable through the implementation of risk based inspection (RBI)

An Update on Risk Based Inspection (RBI) (RMC-12-46)

Using RISK as a basis for maintenance planning

From Fitness for Service to Reliability-Based Mechanical Integrity

An upgrader is brought safely back into production a year ahead of expectations, avoiding an opportunity cost exceeding $300 million.

Risk Based Asset Management - Delivering and Sustaining Value

The business case developed for an RBI program - realized benefits and how the on-going value of the program is measured