RBI/MI Overview

A half-day overview of Mechanical Integrity and Risk Based Inspection

Overview

Risk Based Inspection / Mechanical Integrity Overview

A 1/2 day overview of Mechanical Integrity and Risk Based Inspection (RBI). This session utilizes exercises and interaction to introduce personnel to the MI/RBI work process. All RBI/MI team members as well as stakeholders should benefit from this session.

Course Topics

  • Mechanical Integrity Work Process
  • Introduction to Risk Based Inspection (RBI)

Course Inquiry

For more information about this course or to inquire about a customized version of this course hosted in-house at our Houston, Texas location or on-site at a location convenient to you, please complete the form below.


Related Services

Risk Based Inspection (RBI) Implementation and Planning

AOC has delivered thousands of sustainable Risk Based Inspection (RBI) programs earning the trust of owner operators.

Integrity Operating Window Development

Key parameters and mitigating actions for variables that may dramatically affect the intended design life of your asset

Development of Mechanical Integrity (MI) Procedures and Processes

A maintenance system designed in which elements work together as a quality system for maximum returns

RAM, RCM, FMEA, FMECA and Bad Actor Analysis

AOC delivers the policies, procedures, work processes, knowledge and actions such as preventive maintenance, predictive maintenance, and condition monitoring tasks.

Mechanical Integrity Assessments

An interdependent assessment of your people, process, and technologies for a confident path forward

Damage Mechanism Review / Corrosion Study

One of the most important steps in an RBI project is the corrosion study or damage mechanism review.

End-of-Life, Remaining-Life, and Fitness-for-Service Assessments

When evaluation of inspection results suggest that an asset is near its end of useful life, Fitness for Service evaluations can determine if the asset us suitable for continued operation.

Corrosion Control Planning

Achieving zero corrosion-related loss of primary containment in the refining industry.

Reliability Based Asset Management - AIM for all asset families

Asset Integrity Management for all asset families - Rotating, Electrical, Instrumentation, and Fixed Assets

Related Training

API 580 RBI Overview

What impact does Risk Based Inspection (RBI) have on my organization?

API 580 Training

Is your Risk Based Inspection (RBI) program aligned with the API 580 Recommended Practice? Are you ready for certification?

API 581 Overview

What's actually going on inside all of that fancy software? An introduction to the API 581 methodology.

Risk Based Inspection (RBI) - A Mechanical Integrity Best Practice

What are your goals for RBI? How will you measure your success? How will you sustain that success?

Reliability Revolution - Measuring the Value of an RBI Program

How does one of the largest chemical manufacturers measure the value of their RBI program?

Value Proposition

Developing the value proposition and business case for an RBI program

Related Knowledge

Risk Based Inspection Yields Big Savings for Gulf Coast Plant

A 26-Year-Old Gulf Coast Chemical Plant Saves over $15 Million in Related Inspection Activities.

RBMI Implementation Saves Refinery $63 Million

130,000 BPD Refinery Implements RBMI Program and projects a $63 Million savings over 10 years.

Corrosion Under Insulation (CUI) in Plant Equipment and Piping

Implementation of a managed CUI program yields prioritized inspection plans and identifies imminent failures.

Safe Operation of Aging Hydrogen Generation Plants

Integrating DMR, RBI, and IOWs to manage aging plant reliability

The MI Assessment - Understanding Your Mechanical Integrity Goals

Compliance? | Best Practice? | Risk Reduction? | One Step at a Time? | Capture Personnel Knowledge? | All Of The Above?

Production Loss Accounting - Heat Exchanger Bad Actor Analysis

Heat exchanger failures contribute to over $146M in losses for a large refining enterprise.

Risk Based Inspection: What To Expect

Significant findings, even after ten years.

OSHA Compliance

What do you do when you are on the job for six weeks and you have a toxic leak twice the release of the recent DuPont event? Not to mention the fact that it is only 1992 and OSHA 1910.119 is just getting started...

Storage Tank RBI

How many RBI studies have been completed on above ground storage tanks (ASTs)? We have completed hundreds.

Time to Value - Asset Integrity Management

Delivering knowledge based asset files from the true sources of data - confidently, accurately, electronically, and in half the time.

Implementing RBI in Remote Locations

The importance of understanding risk and the significant value attainable through the implementation of risk based inspection (RBI)

An Update on Risk Based Inspection (RBI) (RMC-12-46)

Using RISK as a basis for maintenance planning

From Fitness for Service to Reliability-Based Mechanical Integrity

An upgrader is brought safely back into production a year ahead of expectations, avoiding an opportunity cost exceeding $300 million.

Risk Based Asset Management - Delivering and Sustaining Value

The business case developed for an RBI program - realized benefits and how the on-going value of the program is measured