Nothing is scheduled at this time.
Request more information about when this course will be scheduled or inquire about our on-site training.

2 day course to enable personnel to manage and sustain an existing risk based inspection program using RBMI Software. Once you have implemented an MI/RBI program using, this course is designed to help managers, engineers, and inspectors learn specific ways to maximize the value and ongoing effectiveness of the program.
RBI Work Process using RBMI or RBMI Basic Training
Innovative technology that allows quick, efficient extraction of data into a knowledge-centric world
AOC has delivered thousands of sustainable Risk Based Inspection (RBI) programs earning the trust of owner operators.
Development of maintenance strategies, recommendations, and plans to implement best practices and increase asset life
How well do you know RBI? Take this short quiz to test your knowledge of the API 580 risk-based inspection (RBI) work process.
Create mechanical integrity (MI) program value rather than it being seen as a necessary cost to minimize.
How do I use RBMI to perform MI/RBI tasks?
How does RBMI software estimate risk?
How does GE APM RBI software estimate risk?
How do I use GE APM to perform MI/RBI tasks?
A high level overview introducing Mechanical Integrity and Risk Based Inspection
Don’t let your RBI program become a "paperwork exercise." Learn how to distinguish between a qualified technical partner and a software-only contractor to ensure true operational safety.
What does a strong refining culture actually look like in practice? Explore seven key attributes, from technical authority to management presence, that transform culture into a powerful risk-control system.
How AOC's new AI solution cuts data collection time for Risk-Based Inspection (RBI) projects by automatically extracting and normalizing data from historical engineering documents, achieving very high accuracy and reducing costs.
A proposal for a risk analysis option that allows for individual damage mechanism risk calculation in API 581
Safety-first organizations consistently outperform on reliability when priorities are truly enforced, not just stated.
An update to our original proposal for an API 581 Inspection Plan optimization.
An example to compliment our earlier proposal for a risk analysis option that allows for individual damage mechanism risk calculation in API 581
Reflections on the importance of ensuring your data is accurate and on the impact that having poor data can have on your risk analysis.
Can Non-Intrusive Inspection (NII) finally replace vessel entries? Explore the roadblocks to RBI, validated POD data for UT and RT, and a new framework for technical equivalency in modern refinery maintenance.
Transitioning to Risk-Based Inspection (RBI) delivers measurable efficiency and cost savings, whether you have a mature Mechanical Integrity (MI) program or are starting from scratch. See a simple 100-vessel example saving $645,000 per cycle.
Course Inquiry
For more information about this course or to inquire about a customized version of this course hosted in-house at our Houston, Texas location or on-site at a location convenient to you, please complete the form below.