API 580 Certification

12/9/2020

In January 2019, Scott Jones, the President and CEO of Asset Optimization Consultants set a company objective of having all our Risk Based Inspection (RBI) Consulting Staff certified to API 580. We are very pleased to say that this objective was achieved in early 2020. In this presentation AOC Team Leader, Billy Walker explains why it was so important for the company to be able to achieve this goal. Tune in next month on the 2nd Wednesday for the next post in our series on Risk Based Inspection.

Subscribe to our YouTube Channel

Video Inquiry

Related Services

Reliability Based Asset Management - AIM for all asset families

Asset Integrity Management for all asset families - Rotating, Electrical, Instrumentation, and Fixed Assets

Integrity Operating Window Development

Key parameters and mitigating actions for variables that may dramatically affect the intended design life of your asset

Damage Mechanism Review / Corrosion Study

One of the most important steps in an RBI project is the corrosion study or damage mechanism review.

Related Tools

RBI Potential Savings Calculator

Create mechanical integrity (MI) program value rather than it being seen as a necessary cost to minimize.

API 580 Work Process Quiz

How well do you know RBI? Take this short quiz to test your knowledge of the API 580 risk-based inspection (RBI) work process.

Related Training

API 581 Overview

What's actually going on inside all of that fancy software? An introduction to the API 581 methodology.

Managing and Sustaining an RBI program using RBMI

How do I manage and sustain my MI/RBI program using RBMI software?

Risk Analyst Training for RBMI

How does RBMI software estimate risk?

Learning Management

Achieve an RBI program complete with KPIs, Best Practices, and Skills Validation

Requirements for Becoming a Risk Analyst

What do I need to do to be a Risk Analyst?

Related Knowledge

National Regulation 13 in Brazil

When working in Brazil please be aware that Brazil has its own Regulatory Standard – NR13 – that covers the minimum requirements for managing the integrity and inspection of steam boilers, pressure vessels, storage tanks and interconnecting pipes.

How to Incorporate the New PHMSA Underground Gas Storage Requirements

This is a practical approach to incorporating the new PHMSA gas well rules into your integrity program with the rest of your surface and subsurface assets.

Plant Management 101: Common Work Processes

A dysfunctionality found in many refineries, chemical plants, and other production facilities, is a lack of common asset management work processes.

Asset Value Management vs Asset Performance Management

A look at how the financial sector's concept of Asset Value Management can be applied to the petrochemical industry.

Proposed API 581 Inspection Plan Optimization Example

An example to compliment our earlier proposal for a risk analysis option that allows for individual damage mechanism risk calculation in API 581

Proposed API 581 Inspection Plan Optimization

A proposal for a risk analysis option that allows for individual damage mechanism risk calculation in API 581

RBI Value: Both Transitioning And From The Start

A look at how RBI adds value whether you are just starting out or transitioning from a traditional methodology.

Other Benefits of Risk Based Inspection Implementation

A look at several of the secondary benefits of Risk Based Inspection

Guidelines for Providing Process Conditions for RBI - Part 7: Env Cracking

Additional process data may be needed when environment, stress, and metallurgy are so alligned so as to indicate susceptibility to environmental cracking.

Guidelines for Providing Process Conditions for RBI - Part 6: HTHA

A simple screening to determine HTHA susceptibility and factors to consider when more data is required.