This presentation is the first in our new Video Log Series. Over the next few months the team of consultants at Asset Optimization Consultants will discuss all aspects of the Risk Based Inspection implementation process. We will start with the Key Roles required in the RBI Team and move through the Planning Process; Data Collection; The Damage Mechanism Review; Risk Analysis; Inspection Planning; Training associated with a RBI implementation and finally Risk Projection. For people who are not aware of the history and experience of AOC this presentation shows the breadth and depth of knowledge and experience in the areas of Asset Integrity and Reliability, and the global reach that the company offers.

Subscribe to our YouTube Channel

Video Inquiry

Related Services

Reliability Based Asset Management - AIM for all asset families

Asset Integrity Management for all asset families - Rotating, Electrical, Instrumentation, and Fixed Assets

Damage Mechanism Review / Corrosion Study

One of the most important steps in an RBI project is the corrosion study or damage mechanism review.

Risk Based Inspection (RBI) Implementation and Planning

AOC has delivered thousands of sustainable Risk Based Inspection (RBI) programs earning the trust of owner operators.

Related Tools

RBI Potential Savings Calculator

Create mechanical integrity (MI) program value rather than it being seen as a necessary cost to minimize.

API 580 Work Process Quiz

How well do you know RBI? Take this short quiz to test your knowledge of the API 580 risk-based inspection (RBI) work process.

Related Training

API 581 Overview

What's actually going on inside all of that fancy software? An introduction to the API 581 methodology.

Managing and Sustaining an RBI program using RBMI

How do I manage and sustain my MI/RBI program using RBMI software?

Risk Analyst Training for RBMI

How does RBMI software estimate risk?

Reliability Revolution - Measuring the Value of an RBI Program

How does one of the largest chemical manufacturers measure the value of their RBI program?

RBI/MI Overview

What is Risk Based Inspection?

Related Knowledge

How to Incorporate the New PHMSA Underground Gas Storage Requirements

This is a practical approach to incorporating the new PHMSA gas well rules into your integrity program with the rest of your surface and subsurface assets.

Plant Management 101: Common Work Processes

A dysfunctionality found in many refineries, chemical plants, and other production facilities, is a lack of common asset management work processes.

Asset Value Management vs Asset Performance Management

A look at how the financial sector's concept of Asset Value Management can be applied to the petrochemical industry.

Proposed API 581 Inspection Plan Optimization Example

An example to compliment our earlier proposal for a risk analysis option that allows for individual damage mechanism risk calculation in API 581

Proposed API 581 Inspection Plan Optimization

A proposal for a risk analysis option that allows for individual damage mechanism risk calculation in API 581

RBI Value: Both Transitioning And From The Start

A look at how RBI adds value whether you are just starting out or transitioning from a traditional methodology.

Other Benefits of Risk Based Inspection Implementation

A look at several of the secondary benefits of Risk Based Inspection

Guidelines for Providing Process Conditions for RBI - Part 7: Env Cracking

Additional process data may be needed when environment, stress, and metallurgy are so alligned so as to indicate susceptibility to environmental cracking.

Guidelines for Providing Process Conditions for RBI - Part 6: HTHA

A simple screening to determine HTHA susceptibility and factors to consider when more data is required.

Insights on Improving Inspection Effectiveness

Since the evaluation of inspection effectiveness for RBI can be so subjective, following these suggestions can greatly improve the process.