Steam System Risk Mitigation Using Risk Based Inspection

A review of AOC's partnership with the Dow/DuPont Sabine River Facility, Rob Sladek and Gerald Skinner were part of the team tasked to perform an RBI implementation on the plant's steam system, the goal of which was to mitigate risk and reduce maintenance costs associated with the utilities service. This case study outlines a great success story for an often overlooked, but critical, operation within the plant. Presented on January 30, 2019 at the API 2019 Inspection and Mechanical Integrity Summit.

Steam System Risk Mitigation Using Risk Based Inspection

Steam System Risk Mitigation Using Risk Based Inspection

Slide 1: Steam System Risk Mitigation Using Risk Based Inspection


BIO - Gerald Skinner

Slide 2: BIO - Gerald Skinner


BIO - Rob Sladek

Slide 3: BIO - Rob Sladek


What's the Problem?

Slide 4: What's the Problem?


Steam System Risk Mitigation using RBI

Slide 5: Steam System Risk Mitigation using RBI


Scope

Slide 6: Scope


Project Planning

Slide 7: Project Planning


DMR Findings

Slide 8: DMR Findings


Default Semi-Quantitative Methodology

Slide 9: Default Semi-Quantitative Methodology


Production Consequence Methodology

Slide 10: Production Consequence Methodology


Risk Results

Slide 11: Risk Results


Maintenance Recommendations

Slide 12: Maintenance Recommendations


Inspection Plans

Slide 13: Inspection Plans


Project Results

Slide 14: Project Results


Questions?

Slide 15: Questions?

Case Study Inquiry

Related Services

Risk Based Inspection (RBI) Implementation and Planning

AOC has delivered thousands of sustainable Risk Based Inspection (RBI) programs earning the trust of owner operators.

End-of-Life, Remaining-Life, and Fitness-for-Service Assessments

When evaluation of inspection results suggest that an asset is near its end of useful life, Fitness for Service evaluations can determine if the asset us suitable for continued operation.

Corrosion Control Planning

Achieving zero corrosion-related loss of primary containment in the refining industry.

Related Tools

RBI Potential Savings Calculator

Create mechanical integrity (MI) program value rather than it being seen as a necessary cost to minimize.

API 580 Work Process Quiz

How well do you know RBI? Take this short quiz to test your knowledge of the API 580 risk-based inspection (RBI) work process.

Mechanical Integrity (MI) Compliance Checklist

Is your plant's MI program compliant? Use our checklist to assess your current program against industry standards and receive expert recommendations for improvement.

Related Training

RBI/MI Overview

A high level overview introducing Mechanical Integrity and Risk Based Inspection

Risk Based Inspection (RBI) - A Mechanical Integrity Best Practice

What are your goals for RBI? How will you measure your success? How will you sustain that success?

API 580 RBI Overview

What impact does Risk Based Inspection (RBI) have on my organization?

API 580 Training

Is your Risk Based Inspection (RBI) program aligned with the API 580 Recommended Practice? Are you ready for certification?

API 581 Overview

What's actually going on inside all of that fancy software? An introduction to the API 581 methodology.

Related Knowledge

Improve RBI with Failure Repository

A targeted AI platform using a centralized repository of global loss-of-containment events to identify failure patterns, improve RBI predictions, strengthen mechanical integrity, and provide continuously updated, data-driven risk recommendations.

Unified Risk Framework Across MI, RCM, PHA, and SILSIS.

Unified framework integrating MI, RCM, PHA, and SIL/SIS into one risk-based system using a common matrix, shared failure modes, and closed-loop feedback to align actions, prioritize resources, and ensure consistent, real-world risk reduction.

How can I judge equivalent inspection techniques?

Organizations that follow the spirit of risk-based inspection rather than its minimum requirements use a definable, structured, auditable process to confirm that an alternate inspection technique provides equal or better risk reduction than a baseline method.

Can you improve reliability focusing on 3 priorities?

Safety-first organizations consistently outperform on reliability when priorities are truly enforced, not just stated.

Is Your RBI 3rd Party Qualified?

Don’t let your RBI program become a "paperwork exercise." Learn how to distinguish between a qualified technical partner and a software-only contractor to ensure true operational safety.

NII vs. IVI: Replacing Internal Visual Inspection in Refineries

Can Non-Intrusive Inspection (NII) finally replace vessel entries? Explore the roadblocks to RBI, validated POD data for UT and RT, and a new framework for technical equivalency in modern refinery maintenance.

Loss of Containment (LOC) Event Repository Data Consistency

A globally standardized Loss of Containment Event Repository using validated data, controlled taxonomies, traceable evidence, and confidence scoring to improve RBI, mechanical integrity, process safety, and AI-driven failure prediction.

Achieving Unified Risk Management Through A Formal Acceptable Risk Policy.

A formal acceptable risk policy standardizes risk tolerance, assigns decision authority by risk level, and requires escalating approvals for higher risk, improving consistency, transparency, and resource prioritization while preventing unmanaged risk exposure.

Why is Management Of Change (MOC) so poorly executed?

MOC fails not from lack of knowledge, but from conflict with operational pressures. Speed is rewarded over rigor, definitions are unclear, ownership is weak, and risk reviews become procedural, allowing changes, cumulative risk, and hazards to go unmanaged.

How to practically implement RBI for oil and gas production.

Practical guide for implementing a Mechanical Integrity and RBI program for U.S. oil and gas wellfield, gathering, and midstream facilities. Aligns lifecycle asset management, inspection, and risk control with API standards, PHMSA pipeline rules, and OSHA PSM requirements.