Value Proposition

Significant value can be obtained from implementing and managing a risk based inspection (RBI) program in your refining, petrochemical or chemical facility. We will show you real examples from owner operators along with empirical results comparing current maintenance costs and risks with the reduced maintenance costs and risk reduction following the implementation of RBI.
Webinar: developing the value proposition and business case for an rbi program

Bring your pen - you're going to need it - and be prepared to share the following:

  • Lost Profit/Day During Shutdown
  • Analysis Interval (years)
  • Turnaround interval or duration set by inspectors / testing?
  • Number of Pressure Vessels
  • Number of Columns
  • Number of API Tanks
  • Number of Piping Circuits
  • Number of PSVs
  • Average Vessel Internal Inspection Interval
  • Average Vessel External INspection Interval
  • Average API Tank Internal Inspection Interval
  • Average API Tank External Inspection Interval
  • Average PSV Inspection Interval

We will show you how to calculate the following: RBI Value To Plant

Webinar Inquiry

Related Services

Risk Based Inspection (RBI) Implementation and Planning

AOC has delivered thousands of sustainable Risk Based Inspection (RBI) programs earning the trust of owner operators.

Master Data Management and Data Conversion

Innovative technology that allows quick, efficient extraction of data into a knowledge-centric world

Related Training

RBI/MI Overview

What is Risk Based Inspection?

API 580 RBI Overview

What impact does Risk Based Inspection (RBI) have on my organization?

API 580 Training

Is your Risk Based Inspection (RBI) program aligned with the API 580 Recommended Practice? Are you ready for certification?

API 581 Overview

What's actually going on inside all of that fancy software? An introduction to the API 581 methodology.

Related Knowledge

Guidelines for Providing Process Conditions for RBI - Part 6: HTHA

A simple screening to determine HTHA susceptibility and factors to consider when more data is required.

Insights on Improving Inspection Effectiveness

Since the evaluation of inspection effectiveness for RBI can be so subjective, following these suggestions can greatly improve the process.

Guidelines for Providing Process Conditions for RBI - Part 5: Low Temp

This article suggests additional factors to consider when providing process conditions for equipment exposed to low temperatures.

Qualitative Risk Assessment of a Commercial Refrigeration System

A case study presenting the methods used to calculate qualitative risk for a critical refrigeration system and the results of the assessment.

Managing Reliability of Ethane Crackers using DMR, RBI, and IOWs

How RBI, DMR, and IOW programs can be used to manage reliability of Ethane crackers.

Guidelines for Providing Process Conditions for RBI - Part 4: High Temp

This article suggests additional factors to consider when calculating probablity of failure for equipment exposed to high temperatures.

Guidelines for Providing Process Conditions for RBI - Part 3: Fluids

This article offers guidance on the selection of a representative fluid for use in your RBI consequence evaluation.

Steam System Risk Mitigation Using Risk Based Inspection

The benefits of utilizing risk-based methodologies for the inspection programs of often overlooked utilities systems

5 Things to Consider When Choosing Your API Training Provider

Not all vendors are created equal. Some up-front research can go a long way toward a high-quality learning experience.

Goal: 100% API 580 Certified

A long-standing vision of AOC, we are well on our way to meeting the goal of having 100% of our RBI staff certified to API 580.