13 entries found for "Process Safety Management"

  Why We Still See Refinery Fires - More Than 30 Years After OSHA 1910.119

by Michael Hurley, 11/20/2025

Tags: HSE Process Safety Management Regulation Risk Management

Despite OSHA's 1992 Process Safety Management (PSM) standard, refinery and chemical plant fires continue to make headlines. This post breaks down the seven systemic reasons why these incidents persist. We explore how mere compliance, aging infrastructure, weak safety culture, and reactive risk management prevent the elimination of catastrophic risks.

0 Comments


  PHMSA vs OSHA for Hydrocarbon Facilities

by Michael Hurley, 11/12/2025

Tags: Mechanical Integrity Process Safety Management Regulation

Hydrocarbon facilities in the U.S. frequently face overlapping regulation from the Pipeline and Hazardous Materials Safety Administration (PHMSA) and the Occupational Safety and Health Administration (OSHA). While PHMSA primarily governs transportation safety via pipelines (49 CFR 190-199), OSHA focuses on worker safety and health within facilities, including Process Safety Management (PSM). This post clarifies their distinct scopes, common jurisdictional boundaries (e.g., at the first valve inside a facility), and provides tips for operators to integrate their compliance programs.

0 Comments


  Why Moving to RBI Makes Sense - No Matter Where You Start

by Michael Hurley, 11/5/2025

Tags: Mechanical Integrity Process Safety Management Risk Based Inspection Risk Management

Discover how transitioning to a Risk-Based Inspection (RBI) approach can deliver real value and significant cost savings over traditional time/condition-based Mechanical Integrity (MI) programs. We use a simple 100-vessel example to show a potential $645,000 savings per inspection cycle and discuss how RBI accelerates compliance and prioritizes safety-critical tasks.

0 Comments


  Proposal for Individual Damage Mechanism Risk Calculation in API 581

by Michael Hurley, 10/22/2025

Tags: API 581 Mechanical Integrity Process Safety Management Risk Analysis Risk Based Inspection Risk Management Technology

In 2021, I published a proposed change to the API 581 PoF calculation. While I believe API 581 is solid as a recommended practice, I believe that inspection planning can be further optimized and fine-tuned to adapt to organizational needs. Since then, the original article has prompted a variety of comments and questions and so I have rewritten the original article for, hopefully, a little more clarity, and I have consolidated the top questions along with my comments.

0 Comments


  The Top Three RBI Risks That Cannot Wait for a Budget Rebound

by Michael Hurley, 10/1/2025

Tags: CUI Inspection Mechanical Integrity Process Safety Management Regulation Risk Risk Analysis Risk Based Inspection Risk Management Value

When organizations face budget cuts, they may postpone projects, but certain risks are too critical to delay. This post highlights three such Risk-Based Inspection (RBI) risks that demand immediate attention: high-risk equipment, Corrosion Under Insulation (CUI), and overdue critical inspections. Acting now can safeguard people, assets, and the bottom line from costly failures.

0 Comments


  A Practical Way to Incorporate the New PHMSA Underground Gas Storage Requirements Into your MI Program

by Michael Hurley, 3/11/2021

Tags: Damage Mechanisms Inspection Mechanical Integrity Process Safety Management Regulation Risk Analysis Risk Based Inspection Risk Management

PHMSA has out a new rule for underground natural gas storage facilities (UNGSFs). This is practical approach to incorporating gas wells into your mechanical integrity program with the rest of your surface and subsurface assets.

0 Comments


  Plant Management 101: Common Work Processes

by Michael Hurley, 3/3/2021

Tags: Asset Performance Management Data Collection Data Validation Mechanical Integrity Process Safety Management Reliability Risk Management Training Work Process

This article deals with the dysfunctionality found in many refineries, chemical plants, and other production facilities. This can lead a facility to not reaching its value and reliability goals. One of the main reasons for this dysfunctionality is facility departments not using a common asset management work process.

1 Comments


  Proposed API 581 Inspection Plan Optimization Example

by Michael Hurley, 2/4/2021

Tags: API 581 Mechanical Integrity Process Safety Management Risk Analysis Risk Based Inspection Risk Management Technology

This article deals with a proposal for a risk analysis option that allows for individual damage mechanism risk calculation. This is an example of how it can be applied and how it domonstrates value.

2 Comments


  Proposed API 581 Inspection Plan Optimization

by Michael Hurley, 1/27/2021

Tags: API 581 Mechanical Integrity Process Safety Management Risk Analysis Risk Based Inspection Risk Management Technology

This article deals with a proposal for a risk analysis option that allows for individual damage mechanism risk calculation. This allows for these individual damage mechanism risks to be compared to a risk target that when reached generates an inspection task with its own due date.

3 Comments


  RBI Value: Both Transitioning And From The Start

by Michael Hurley, 1/21/2021

Tags: Mechanical Integrity Process Safety Management Risk Based Inspection Risk Management

This article deals with the value of going directly to an Risk Based Inspection (RBI) program from nothing or transitioning from a time/condition based program and demonstrates that an RBI program is the efficient use of resources.

0 Comments


  Possible PHMSA and OSHA Jurisdictional Clarity

by Michael Hurley, 1/14/2021

Tags: Mechanical Integrity Process Safety Management Regulation

PHMSA has out for comment, draft document information, that clarifies its jurisdiction in relation to OSHA for Midstream Processing Facilities.

0 Comments


  Qualitative RBI of a Commercial Refrigeration System

by Rob Sladek, 8/7/2018

Tags: Consequence Probability Process Safety Management Risk Risk Based Inspection

How the application of qualitative RBI helped a client prioritize equipment damage mitigation in order to effectively scope a refurbishment project and achieve their system reliability goals. This scenario highlights a significant problem for some refrigeration system owner/users who may be maintaining their assets as prescribed but are unaware of the damage mechanisms that could affect the reliability of their assets and safety of their personnel.

0 Comments


  Process Safety Management (PSM) and Commercial Refrigeration

by Mike Hurley, 7/18/2018

Tags: Process Safety Management

Organizations that have commercial refrigeration facilities need to be aware of new OSHA Process Safety Management (PSM) regulations. Since these facilities are something of an outlier, when compared with chemical processing and refineries, it may not be readily apparent. However, anyone with large quantities of anhydrous ammonia at their facilities needs to prepare for potential NEP audits.

1 Comments